Kanban em Inglês: Gestão Visual de Fluxo para Times Globais
WIP limits, pull systems e flow metrics com vocabulário nativo.
Kanban é mais que um quadro visual - é uma filosofia de gestão de fluxo. Comunicar Kanban em inglês requer entender os conceitos além da tradução literal.
Vocabulário Essencial
Comparativo: como um iniciante diria vs. como um executivo nativo diria
- WIP Limit (Work In Progress Limit)
Maximum number of work items allowed in a workflow stage.
❌ Básico"How much work at a time."
✅ Executivo"We've set a WIP limit of 5 in the development column to optimize flow."
Quando usar: Discussões de capacidade e fluxo.
- Pull System
Work is pulled into the next stage only when capacity is available.
❌ Básico"Take work when ready."
✅ Executivo"Our pull system ensures teams only take new work when they have capacity."
Quando usar: Explicação do modelo Kanban.
- Lead Time
Time from when work is requested to when it's delivered.
❌ Básico"How long it takes."
✅ Executivo"We've reduced lead time from 14 days to 6 days through WIP management."
Quando usar: Métricas de eficiência e reports.
- Throughput
Number of work items completed per time period.
❌ Básico"How much we finish."
✅ Executivo"Our throughput increased from 12 to 18 items per week after optimizing WIP."
Quando usar: Capacity planning e forecasting.
- Bottleneck
A workflow stage that constrains overall throughput.
❌ Básico"Where things get stuck."
✅ Executivo"Code review is our current bottleneck. We're addressing it by cross-training."
Quando usar: Análise de fluxo e melhoria.
- Cycle Time
Time from when work starts to when it's completed.
❌ Básico"Time to do the work."
✅ Executivo"Average cycle time for bug fixes is 2.3 days, down from 4.1 days."
Quando usar: Métricas de processo e reports.
Erros Comuns a Evitar
"We have too much work."
"We're exceeding our WIP limit. Let's focus on completing items before starting new ones."
"It takes too long."
"Our lead time is 14 days. The target is 6 days by reducing handoffs."
"This column is stuck."
"We've identified a bottleneck in QA. Let's swarm to clear the queue."
Phraseology Tips
- Use 'manage flow' not 'manage tasks'
- Say 'visualize' and 'make work visible'
- Frame WIP limits as 'capacity constraints that optimize flow'
- Use 'pull' language: 'pull new work', 'pull system'